NEW CENTE
Corporate News
Donggang Huayu Distributed Photovoltaic Power Station Completed and put into operation for grid connected power generation
The project is located in Xutun Village, Xujiabao Village, Bodhisattva Temple Town, Donggang City. The project mainly utilizes the existing factory roof and shed area of 2580 square meters of Donggang Huayu Foundry Co., Ltd., installs 880 photovoltaic modules with 545Wp monocrystalline silicon high-efficiency modules, a total installed power of 479.6kWp, and an average annual power generation of 618200 kWh.
This project mainly utilizes the existing factory roof and car shed area to install solar photovoltaic power generation facilities. It has the advantages of not occupying land, utilizing clean, renewable natural energy for solar power generation, not consuming other energy resources, and pollution-free. It has high economic, social, and environmental benefits.